Main content

2025

Public Notice for Proposed Collection of Passenger Facility Changes at Colorado Springs Airport

  • Terminal rehabilitation projects, Milton E. Proby Pkwy rehabilitation, updates to Checked Baggage Inspection System, construction of Federal Inspection Services Facility, design of maintenance shop, and airfield erosion repair.

2024

Public Notice for Proposed Collection of Passenger Facility Changes at Colorado Springs Airport

  • Rehabilitation of Runway 17R/35L, its associated taxiway connectors, and updating NAVAIDs, specifically a wind cone, REIL and PAPI components.

2023

Public Notice for Proposed Collection of Passenger Facility Charges at Colorado Springs Airport

  • Replacement of the existing Flight Information Display System (FIDS) and the Baggage Information Display System (BIDS) at the Colorado Springs Airport.
  • Design phase services for the rehabilitation of Runway 17R/35L, its associated taxiway connectors, and updating NAVAIDs, specifically a wind cone, REIL and PAPI components.
  • Terminal Rehabilitation Project