Site Accessibility Evaluation

Americans with Disabilities Act
Title II (Public Services: State and Local Government)
Evaluation PU19-0146 Cover Photo
Prairie Grass Park
710 Chapman Dr
Colorado Springs, CO 80916
Accessibility Evaluation
Inspection Date: 11/15/2021
Inspectors: Robert Hernandez
Prepared By
City of Colorado Springs Logo
City of Colorado Springs
(719) 385 - 5175
https://coloradosprings.gov/
Report Date: 02/24/2025

FOR RECORD:

FROM: Robert L. Hernandez, Title II ADA/Section 504 – Manager

DATE: 02/24/2025

SUBJECT: Prairie Grass Park Self-Evaluation

1. On 11/15/2021, Title II ADA / Section 504 Coordinator(s) from the Office of Accessibility performed a Title II - Americans with Disabilities Act (ADA) Self-Evaluation. This evaluation was performed in accordance with 1991/2010 ADA Standards for Accessible Design.

2. Priorities for removing barriers are assigned in accordance with the ADA Checklist for Existing Facilities, promulgated by the ADA National Network. The checklist follows the four priorities listed in the Department of Justice ADA Title III regulations. These priorities are equally applicable to state and local government facilities:

Priority 1 - Accessible approach and entrance
Priority 2 - Access to goods and services
Priority 3 - Access to public toilet rooms
Priority 4 - Access to other items such as water fountains and public telephones

3. Corrective actions to findings were / will be submitted to the City maintenance work request system and will be managed in accordance with the City Transition Plan. Note: Recommended corrections may be modified where appropriate. Corrections are developed in consideration of the “Program Access” provisions of Title II, where applicable.

4. A copy of this report will be maintained by the Office of Accessibility. Updates to the findings included in this report will be available at the following link: https://access6.bluedag.com/access/barriers/GfhHF91nlvMItTaD4rVzj85XBKNZxywJ. Alternatively, this link is available from the Office of Accessibility’s webpage on the City of Colorado Springs website.


City of Colorado Springs Title II ADA/Section 504 – Manager
30 S. Nevada Ave, Suite 301
Colorado Springs, CO 80903
ADACompliance@coloradosprings.gov


Atch 1. City of Colorado Springs, ADA Self-Evaluation Report

Sincerely,


Robert Hernandez

Findings

Accessible Routes

BFID: 189198

There are no on-street accessible parking stalls. However, none of the on-street parking is marked.

Where on-street parking is provided on the block perimeter and the parking is marked, accessible parking spaces shall be provided.
Citation:
2011 PROWAG Section R214
Where on-street parking is provided on the block perimeter and the parking is marked or metered, accessible parking spaces complying with R309 (On-Street Parking Spaces) shall be provided in accordance with Table R214 (Scoping - On-Street Parking Spaces).

Recommendation:
Mark an accessible parking space near a curb ramp into the park.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 189198 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
No marked on-street accessible parking

BFID: 192507

There are multiple issues with this curb ramp including:

No detectable warnings.

An exposed bollard base.

A gutter pan with an 11.6% counterslope.

Sediment in the gutter pan.
Citation:
2010 ADAS Section 406
Curb Ramps

Recommendation:
Remove and replace the curb ramp.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Additional Finding Photos
Finding 192507 Additional Photo

BFID: 192508

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pad of concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192508 Additional Photo

BFID: 192509

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192509 Additional Photo

BFID: 192510

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192511

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Do nothing as this can be remedied when the turn concrete is replaced. See the following finding for recommendation and cost.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 192511 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192511 Additional Photo

BFID: 192512

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192513

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance. Re-grade to achieve a compliant running slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192514

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.

Vertical surface discontinuities shall be 0.5 inch maximum. Vertical surface discontinuities between 0.25 inch and 0.5 inch shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Do nothing as both of these discontinuities are associated with pads that will need to be replaced due to high cross-slopes. See the previous finding for the associated cost.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192514 Additional Photo

BFID: 192515

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192516

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192516 Additional Photo

BFID: 192517

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192518

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192518 Additional Photo

BFID: 192519

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192519 Additional Photo

BFID: 192520

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Replace the sunken pad to compliance. The cost is included in the work detailed in the previous finding.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192521

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192521 Additional Photo

BFID: 192522

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliance. Re-grade the section to achieve a compliant running slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 192522 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192522 Additional Photo

BFID: 192523

The walking surface has gaps over 1/2" wide.
Citation:
2010 ADAS Section 302.3
Openings in floor or ground surfaces shall not allow passage of a sphere more than 1/2 inch (13 mm) diameter except as allowed in 407.4.3, 409.4.3, 410.4, 810.5.3 and 810.10. Elongated openings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Remove and replace pads at these locations. The cost is included in the work detailed in the previous finding as these pads also have excessive cross-slopes.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Additional Finding Photos
Finding 192523 Additional Photo

BFID: 192524

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance. Re-grade to achieve compliant running slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192525

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192526

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192528

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192529

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace heaving pad. Please see previous finding for cost estimate as it also has excessive cross slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192530

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192530 Additional Photo

BFID: 192531

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192531 Additional Photo

BFID: 192532

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192532 Additional Photo

BFID: 192533

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192534

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192534 Additional Photo

BFID: 192535

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliant. Remove and replace adjacent pad(s) if necessary to achieve a compliant running slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192536

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time as the route does not provide access to the apartment complex nor any other elements.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192536 Additional Photo

BFID: 192538

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192541

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace the high pad. Please see the previous finding for cost as the pad also has a high cross slope.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192539

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192537

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time as the route does not provide access to the apartment complex nor any other elements. Contact the appropriate department to explore whether or not this will be open for access to the apartments or fenced off permanently like the other route to the north.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192537 Additional Photo

BFID: 192546

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete at this turn.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192546 Additional Photo

BFID: 192545

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192545 Additional Photo

BFID: 192547

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace the low pad as it also has a high cross slope. This work and the associated cost have already been documented in the previous finding.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192548

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace pads to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192549

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 192549 Additional Photo

BFID: 192550

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 192551

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace pads as all three also have excessive cross slope and are documented in the previous finding. Costs are included in the previous finding.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

Play Areas

BFID: 189205

The play area itself is engineered wood fill, which is an acceptable surface for accessibility. However, there is not a ramp into the play area.
Citation:
2015 IBC Section 1104.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site.

2010 ADAS Section 206.2.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.

Recommendation:
Install a ramp.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189205 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
No ramp into the play area

BFID: 189216

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Grind to less than 1/2".
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189216 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Vertical displacement between panels in the skate park
Vertical displacement between panels in the skate park
Vertical displacement between panels in the skate park
Vertical displacement between panels in the skate park
Vertical displacement between panels in the skate park

BFID: 189217

The basketball goal posts and backstops are in place, but the hoops and nets are missing from 3 of them.
Citation:
2010 ADAS Section Advisory
None

Recommendation:
Install new hoops.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Corrected Condition:
Hoops and nets were installed.
No hoops on the basketball goals
Finding 189217 Corrected Photo

BFID: 192543

The curb ramp side flares exceed maximum slope allowances.

The sides of curb ramps (curb ramp flares) where provided, shall not be steeper than 1:10.
Citation:
2010 ADAS Section 406.3
Where provided, curb ramp flares shall not be steeper than 1:10.

Recommendation:
Remove and replace curb ramp.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of finding

BFID: 192544

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace concrete to compliance.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

General

BFID: 189206

There are no accessible tables.

At least 5% of each type in each functional area of dining surfaces must be accessible and must be dispersed throughout the space or facility containing dining surfaces. An accessible table must be on an accessible route (36 inches minimum) and have knee and toe spaces at least 27 inches high, 30 inches wide and 17 inches deep. The tops of tables and counters shall be 28 inches to 34 inches from the floor or ground.
Citation:
2010 ADAS Section 226.1
Where dining surfaces are provided for the consumption of food or drink, at least 5 percent of the seating spaces and standing spaces at the dining surfaces shall comply with 902. In addition, where work surfaces are provided for use by other than employees, at least 5 percent shall comply with 902.

Recommendation:
Remove the bench from one side of the table so it is accessible.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Finding 189206 Main Photo
Additional Finding Photos
No accessible picnic tables
No accessible picnic tables

BFID: 189207

Due to the design of the table and seats, there is not a 30" by 48" clear space at this table for a wheelchair.
Citation:
2010 ADAS Section 226.1
Where dining surfaces are provided for the consumption of food or drink, at least 5 percent of the seating spaces and standing spaces at the dining surfaces shall comply with 902. In addition, where work surfaces are provided for use by other than employees, at least 5 percent shall comply with 902.

Recommendation:
In the future, when designing custom furniture, determine how it can be made accessible.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
The table is not accessible

BFID: 192542

The path contains multiple issues and is not accessible.

The path of travel exceeds the maximum allowable cross and running slope requirements. It also contains changes in level and/or gaps that exceed the allowable maximum requirements. The path of travel does not meet the minimum width requirements for clearances, turning spaces, and/or passing spaces. The floor or ground surface is not firm, stable, and slip resistant.
Citation:
2010 ADAS Section 403.1
Walking surfaces that are a part of an accessible route shall comply with 403.

Recommendation:
Remove and replace the concrete at the pavilion and seating area adjacent to the playground.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Finding 192542 Main Photo
Additional Finding Photos
Finding 192542 Additional Photo
Finding 192542 Additional Photo