Accessible Routes
BFID: 193630
The accessible route of travel on the walk or sidewalk has cross slopes greater than 2%.
Cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Entering the park from the northwest, the first three concrete pads of the detached sidewalk along Potomac Drive have cross slopes of 2.4-4.2%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193607
Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).
More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Turning Spaces A, B, and C have slopes of 3.8%, 2.9%, and 3.1% respectively. Connector 1 is comprised of four pads with running slopes between 5.4 and 5.9%. The two middle pads also have cross slopes up to 5.4%. Connector 2 has one pad with a cross slope of 2.6%. Connector 3 (four pads) has cross slopes between 3.0 and 4.3%. Additionally, there is a 3/4" vertical discontinuity between Turning Space C and Connector 3.
Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193632
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Along the north side of the park, the run of concrete along the north side of the baseball field has at least 44 pads with cross slopes from 2.3 to 4.4%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193633
The T-shaped or circular turning space has excessive slopes.
Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
As Built:
The slope at this turning space is 4.5%. Additionally, there is 3/4" vertical discontinuity in the direction of Potomac Drive.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193634
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Along the north side of the park, north of the pond, 14 concrete pads have cross slopes between 2.4 and 4.6%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193635
The accessible route on the site has running slopes greater than 5 percent and has not been constructed as a ramp (i.e. handrails, edge protection, etc.).
When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Along the north side of the park, just west of the play area, the running slope of 11 concrete pads is between 5.5 and 7.9%.
Recommendation:
Remove and replace at <5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193638
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Adjacent to the play area, ten pads of concrete have cross slopes between 2.4 and 4.3%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 189691
The concrete expansion joint is spaced greater than 1/2 inch.
Openings in floor or ground surfaces shall not allow passage of a sphere more than 1/2 inch diameter. Elongated openings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.
Citation:
2010 ADAS Section 302.3
Openings in floor or ground surfaces shall not allow passage of a sphere more than 1/2 inch (13 mm) diameter except as allowed in 407.4.3, 409.4.3, 410.4, 810.5.3 and 810.10. Elongated openings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.
As Built:
There are 1" wide gaps in the sidewalk at the benches.
Recommendation:
Install new backer rod and reseal these joints.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193609
Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).
More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Turning Spaces A, B, and C have slopes of 2.3, 6.2, and 2.9%, respectively. Connector 1 is comprised of two pads of concrete with cross slopes of 4.2 and 3.5%.
Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 189692
The accessible route has running slopes greater than 5 percent across the width of the walk and has not been constructed as a ramp (i.e. handrails, edge protection, etc.).
When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
North from the play area, the 26 concrete pads leading to Stable Court have running slopes between 6.2 and 10.3%.
Recommendation:
Do nothing at this time. An accessible route from this entrance to the park would require a series of switchbacks to achieve compliant slopes. Recommend focusing on rehabilitating the route from Potomac Drive where compliant slopes are more readily achievable.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193732
The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.
As Built:
Adjacent to the dog waste bag dispenser at the Stable Court entrance to the park is a 7.7% slope. Additionally, the opening is 51.5" from the ground surface.
Recommendation:
Provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions and within reach range of the operable part. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 189694
There are multiple issues with this curb ramp including:
At the top of the ramp is a 1-1/4" wide by 2" deep gap with 3/8" vertical displacement.
There are no detectable warnings.
There is 14.9% slope at the transition to the gutter.
The ramp does not align with the ramp on the north side of the street.
Citation:
2010 ADAS Section 406
Curb Ramps
As Built:
There are multiple issues with the curb ramp at Stable Ct.
Recommendation:
Remove and replace the curb ramp.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193645
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
The first pad of concrete running SE from the pavilion to the Shared Use Path has a cross slope of 2.7%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193647
The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.
As Built:
The slope at this trash can is 3.5%. Additionally, the opening is approximately 28" from the clear floor space.
Recommendation:
Pour additional concrete in front of this trash can to provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions. Include a small curb to retain gravel. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges. The opening must be within 24" of the clear floor space if mounted no higher than 46", or within 10" if mounted no higher than 48".
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 193648
The T-shaped or circular turning space has excessive slopes.
Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
As Built:
The turn to this picnic table has a slope of 2.4%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193649
The knee clearance is not compliant.
The knee clearance shall be 11 inches deep minimum at 9 inches above the finish floor or ground, and 8 inches deep minimum at 27 inches above the finish floor or ground and 30 inches wide minimum.
Citation:
2010 ADAS Section 306.3.3
Where knee clearance is required under an element as part of a clear floor space, the knee clearance shall be 11 inches (280 mm) deep minimum at 9 inches (230 mm) above the finish floor or ground, and 8 inches (205 mm) deep minimum at 27 inches (685 mm) above the finish floor or ground.
As Built:
The knee clearance provided at this picnic table is only 25 1/2".
Recommendation:
Cut a 2" x 6" to length and install it between the post supporting the table and the table surface to raise the table surface by 1 1/2".
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
BFID: 193610
Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).
More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Turning Space A has a slope of 2.8%, and there is 1/2" vertical discontinuity leading to Connector 1. Connector 2 has cross slopes up to 2.5%, and Connector 3 has one pad of concrete with a cross slope of 2.5%.
Recommendation:
Do nothing at this time. This wye junction connects to the Cottonwood Creek Trail, and is beyond the accessible elements of Frank Castello Park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
BFID: 189696
The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.
As Built:
There is 1/2" vertical displacement in the sidewalk.
Recommendation:
Grind to less than 1/2".
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193651
The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.
When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Of 20 total pads of concrete, 13 have cross slope in excess of 2% (between 2.2 and 4.5%), and 4 have running slopes in excess if 5% (between 5.5 and 6.5%).
Recommendation:
Do nothing at this time. This path connects to the Shared Use Path that runs along the SE side of the park, but no other elements.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
BFID: 189698
The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.
As Built:
There is 1/2" vertical displacement in the sidewalk.
Recommendation:
Grind to less than 1/2".
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193636
The T-shaped or circular turning space has excessive slopes.
Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
As Built:
The turning space just west of the play area has a slope of 6.3%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193655
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
This sidewalk runs north and south, separating the pond and the baseball field, and connects to the Shared Use Path. Between the north end of the run and the bench at its midpoint, 15 pads of concrete have cross slopes between 2.3 and 3.9%.
Recommendation:
Do nothing at this time. This path connects to the Shared Use Path, and leads away from the other accessible elements in the park. However, this route could be made accessible, and the addition of an accessible picnic table near the pond would be encouraged.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 193654
The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.
When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
This sidewalk runs north and south, separating the pond and the baseball field, and connects to the Shared Use Path. Between the bench and the culvert 17 pads of concrete have either cross slope up to 3.8% or running slope up to 7.8%.
Recommendation:
Do nothing at this time. This path connects to the Shared Use Path, and leads away from the other accessible elements in the park. However, this route could be made accessible, and the addition of an accessible picnic table near the pond would be encouraged.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 193611
Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).
More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Turning Space B has a slope of 3%. Connector 2 has cross slopes between 2.7 and 3.3%. Connector 3 is comprised of three pads of concrete, two of which have cross slopes between 2.5 and 2.7%.
Recommendation:
Do nothing at this time. This wye junction connects to the Cottonwood Creek Trail, and is beyond the accessible elements of Frank Castello Park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
BFID: 193657
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Along the north side of the multicourt, the sidewalk connecting to the shared use path has 13 concrete pads with cross slope between 2.3 and 3.6%.
Recommendation:
Do nothing at this time. This pathway connects to the shared use path, and does not connect to any of the accessible elements of the park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193658
The T-shaped or circular turning space has excessive slopes.
Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
As Built:
The turning space between the sidewalk along Potomac Drive and the multicourt has a slope of 3.8%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193659
The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.
As Built:
The slope at this dog waste bag dispenser is 3.5%. Additionally, the opening is at a height of 52 1/2", over the maximum allowable height of 48" for operable parts less than 10" from the provided clear floor space.
Recommendation:
Provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions and within reach range of the operable part. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 193660
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
One pad of concrete leading to the multicourt has a cross slope of 2.6%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193662
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Between the sidewalk along Potomac Drive and the turn to the multicourt, four concrete pads have cross slopes from 2.4 to 3%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193661
The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.
As Built:
The slope in front of this trash can is 3.3%. Additionally, the reach to the opening of the trash can is 28", beyond the maximum 24" allowable (if the opening is less than 46" high). Furthermore, loose gravel spilling into the sidewalk prevent the clear floor space from being considered firm, stable, and slip-resistant.
Recommendation:
Pour additional concrete in front of the trash can to provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions, and to reduce the reach range to the operable part. Additionally, install a small curb to retain loose gravel from spilling into the clear floor space. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
BFID: 193608
Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).
More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
Turning Space A has a slope of 4.8%, and Turning Space B has a slope of 3.6% that is also cracked. Connector 1 is comprised of three pads of concrete with cross slopes between 3.1 and 4.6%.
Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193665
The path of travel contains multiple issues and is not accessible.
Citation:
2010 ADAS Section 403.1
Walking surfaces that are a part of an accessible route shall comply with 403.
As Built:
This concrete pad (directly adjacent to the top landing of the curb ramp on Potomac) is significantly deteriorated, presumably from maintenance vehicles entering the park via the curb ramp.
Recommendation:
Install a dedicated curb cut / vehicle entrance for maintenance vehicles somewhere along Potomac. Reinforce the concrete to protect it from the weight of the vehicles.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193664
There are multiple issues with this curb ramp including:
Citation:
2010 ADAS Section 406
Curb Ramps
As Built:
At the curb ramp into the park along Potomac Drive, there is a 1/2" vertical discontinuity at the base of the ramp. Additionally, the top landing of the ramp has a slope of 2.8%.
Recommendation:
Remove and replace the curb ramp.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 193663
The accessible route of travel on the walk or sidewalk has cross slopes greater than 2%.
Cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
The detached sidewalk along Potomac Drive has 24 concrete pads with cross slope greater than 2%, between 2.3 and 4.1%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Play Areas
BFID: 189684
The city has an obligation to provide access to programs and services. The baseball field is about 30' from the nearest sidewalk.
Citation:
2015 IBC Section 1104.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site.
2010 ADAS Section 206.2.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.
As Built:
There is not an accessible route to the baseball field.
Recommendation:
Evaluate baseball fields across city parks and determine which to make accessible.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 189758
The surface of the play area is sand. There is about 3500 square feet of sand.
Citation:
2010 ADAS Section 302.1
Floor and ground surfaces shall be stable, firm, and slip resistant and shall comply with 302.
As Built:
The play area surface is sand.
Recommendation:
Provided engineered wood fill.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 189688
The surface of the pedestrian access route is not firm, stable and slip resistant due to the sand spilling out of the play area.
Citation:
2011 PROWAG Section R302.7
The surfaces of pedestrian access routes and elements and spaces required to comply with R302.7 that connect to pedestrian access routes shall be firm, stable, and slip resistant and shall comply with R302.7.
As Built:
The sand from the play area spills onto the sidewalk.
Recommendation:
Replace the sand with engineered wood fiber. In the meantime, keep the sand swept off the sidewalk.
Cost estimate included in another finding.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193637
The accessible path of travel has cross slopes greater than 2%.
Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.
As Built:
This pad of concrete has a cross slope of 2.4%.
Recommendation:
Remove and replace at <2%.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
BFID: 189689
The surface of the pedestrian access route has openings greater than 1/2 inch.
The entire poured in place are is about 340 square feet.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.
As Built:
There are holes in the poured in place surface at the play area.
Recommendation:
Remove and replace the poured in place surface.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 193639
The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.
1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.
Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.
2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.
As Built:
There is divot approximately 4" x 3" by 1" deep within the turning space to one the playground elements.
Recommendation:
Remove and replace the panel.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
BFID: 189690
The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.
1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.
Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.
2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.
As Built:
There are both gaps greater than 1/2" wide and changes in elevation greater than 1/2" in the area of and surrounding the pavilion. Next to the pavilion, leading from the slides, there is a large divot in the concrete.
Recommendation:
Remove and replace.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 189704
At two joint lines, there is 3/8" vertical displacement.
The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.
As Built:
There is vertical displacement at the entrance to the multi-use court.
Recommendation:
Grind to 1/4".
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos
BFID: 189705
At midcourt, there is a 1" gap. It was previously filled but is deteriorating.
There is a 3" by 2-1/2" by 2" deep hole in the surface. The panel is also fractured.
The fence is pulled 4" away from the posts.
The surface of the pedestrian access route has openings greater than 1/2 inch.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.
As Built:
There are multiple issues with the multi-use court.
Recommendation:
Clean out and refill the gap. Remove and replace the fractured panel. Reattach the fence.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Additional Finding Photos