Site Accessibility Evaluation

Americans with Disabilities Act
Title II (Public Services: State and Local Government)
Evaluation PU20-0023 Cover Photo
Frank Castello Park
7640 Potomac Dr
Colorado Springs, CO 80920
Accessibility Evaluation
Inspection Date: 04/21/2022
Inspectors: Robert Hernandez
Prepared By
City of Colorado Springs Logo
City of Colorado Springs
(719) 385 - 5175
https://coloradosprings.gov/
Report Date: 03/14/2025

FOR RECORD:

FROM: Robert L. Hernandez, Title II ADA/Section 504 – Manager

DATE: 03/14/2025

SUBJECT: Frank Castello Park Self-Evaluation

1. On 04/21/2022, Title II ADA / Section 504 Coordinator(s) from the Office of Accessibility performed a Title II - Americans with Disabilities Act (ADA) Self-Evaluation. This evaluation was performed in accordance with 1991/2010 ADA Standards for Accessible Design.

2. Priorities for removing barriers are assigned in accordance with the ADA Checklist for Existing Facilities, promulgated by the ADA National Network. The checklist follows the four priorities listed in the Department of Justice ADA Title III regulations. These priorities are equally applicable to state and local government facilities:

Priority 1 - Accessible approach and entrance
Priority 2 - Access to goods and services
Priority 3 - Access to public toilet rooms
Priority 4 - Access to other items such as water fountains and public telephones

3. Corrective actions to findings were / will be submitted to the City maintenance work request system and will be managed in accordance with the City Transition Plan. Note: Recommended corrections may be modified where appropriate. Corrections are developed in consideration of the “Program Access” provisions of Title II, where applicable.

4. A copy of this report will be maintained by the Office of Accessibility. Updates to the findings included in this report will be available at the following link: https://access6.bluedag.com/access/barriers/GfhHF91nlvMItTaD4rVzj85XBKNZxywJ. Alternatively, this link is available from the Office of Accessibility’s webpage on the City of Colorado Springs website.


City of Colorado Springs Title II ADA/Section 504 – Manager
30 S. Nevada Ave, Suite 301
Colorado Springs, CO 80903
ADACompliance@coloradosprings.gov


Atch 1. City of Colorado Springs, ADA Self-Evaluation Report

Sincerely,


Robert Hernandez

Findings

Accessible Routes

BFID: 193630

The accessible route of travel on the walk or sidewalk has cross slopes greater than 2%.

Cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193607

Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).

More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Additional Finding Photos
Finding 193607 Additional Photo
Finding 193607 Additional Photo
Finding 193607 Additional Photo
Finding 193607 Additional Photo
Finding 193607 Additional Photo
Finding 193607 Additional Photo

BFID: 193632

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193632 Additional Photo
Finding 193632 Additional Photo
Finding 193632 Additional Photo
Finding 193632 Additional Photo

BFID: 193633

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193633 Additional Photo

BFID: 193634

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193634 Additional Photo

BFID: 193635

The accessible route on the site has running slopes greater than 5 percent and has not been constructed as a ramp (i.e. handrails, edge protection, etc.).

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193635 Additional Photo
Finding 193635 Additional Photo

BFID: 193638

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193638 Additional Photo
Finding 193638 Additional Photo
Finding 193638 Additional Photo
Finding 193638 Additional Photo
Finding 193638 Additional Photo

BFID: 189691

The concrete expansion joint is spaced greater than 1/2 inch.

Openings in floor or ground surfaces shall not allow passage of a sphere more than 1/2 inch diameter. Elongated openings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.
Citation:
2010 ADAS Section 302.3
Openings in floor or ground surfaces shall not allow passage of a sphere more than 1/2 inch (13 mm) diameter except as allowed in 407.4.3, 409.4.3, 410.4, 810.5.3 and 810.10. Elongated openings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Install new backer rod and reseal these joints.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189691 Main Photo
Additional Finding Photos
Gap in the sidewalk at the bench

BFID: 193609

Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).

More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding

BFID: 189692

The accessible route has running slopes greater than 5 percent across the width of the walk and has not been constructed as a ramp (i.e. handrails, edge protection, etc.).

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. An accessible route from this entrance to the park would require a series of switchbacks to achieve compliant slopes. Recommend focusing on rehabilitating the route from Potomac Drive where compliant slopes are more readily achievable.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Finding 189692 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Sidewalk with excessive slopes and vertical displacement
Finding 189692 Additional Photo
Sidewalk with excessive slopes and vertical displacement

BFID: 193732

The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.

Recommendation:
Provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions and within reach range of the operable part. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding

BFID: 189694

There are multiple issues with this curb ramp including:

At the top of the ramp is a 1-1/4" wide by 2" deep gap with 3/8" vertical displacement.

There are no detectable warnings.

There is 14.9% slope at the transition to the gutter.

The ramp does not align with the ramp on the north side of the street.
Citation:
2010 ADAS Section 406
Curb Ramps

Recommendation:
Remove and replace the curb ramp.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Noncompliant curb ramp
Additional Finding Photos
Noncompliant curb ramp

BFID: 193645

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193647

The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.

Recommendation:
Pour additional concrete in front of this trash can to provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions. Include a small curb to retain gravel. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges. The opening must be within 24" of the clear floor space if mounted no higher than 46", or within 10" if mounted no higher than 48".
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding

BFID: 193648

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193649

The knee clearance is not compliant.

The knee clearance shall be 11 inches deep minimum at 9 inches above the finish floor or ground, and 8 inches deep minimum at 27 inches above the finish floor or ground and 30 inches wide minimum.
Citation:
2010 ADAS Section 306.3.3
Where knee clearance is required under an element as part of a clear floor space, the knee clearance shall be 11 inches (280 mm) deep minimum at 9 inches (230 mm) above the finish floor or ground, and 8 inches (205 mm) deep minimum at 27 inches (685 mm) above the finish floor or ground.

Recommendation:
Cut a 2" x 6" to length and install it between the post supporting the table and the table surface to raise the table surface by 1 1/2".
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193610

Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).

More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This wye junction connects to the Cottonwood Creek Trail, and is beyond the accessible elements of Frank Castello Park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Image of finding

BFID: 189696

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Grind to less than 1/2".
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Vertical displacement in the sidewalk
Image that depicts the citation requirements of the code or standard

BFID: 193651

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This path connects to the Shared Use Path that runs along the SE side of the park, but no other elements.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 189698

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Grind to less than 1/2".
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Vertical displacement in the sidewalk
Image that depicts the citation requirements of the code or standard

BFID: 193636

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193655

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This path connects to the Shared Use Path, and leads away from the other accessible elements in the park. However, this route could be made accessible, and the addition of an accessible picnic table near the pond would be encouraged.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193654

The accessible route has running slopes greater than 5% and has not been constructed as a ramp (i.e. handrails,edge protection, etc.). Cross slopes are greater than 2% across the width of the walk.

When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp. Surface cross slopes must not exceed 1 unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This path connects to the Shared Use Path, and leads away from the other accessible elements in the park. However, this route could be made accessible, and the addition of an accessible picnic table near the pond would be encouraged.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193611

Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).

More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This wye junction connects to the Cottonwood Creek Trail, and is beyond the accessible elements of Frank Castello Park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Image of finding

BFID: 193657

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Do nothing at this time. This pathway connects to the shared use path, and does not connect to any of the accessible elements of the park.
Barrier Priority:
Low (4): Should be completed as soon as possible due to being a technical violation, but may not result in providing greater access to persons with disabilities. (Includes findings that are technically violations but provide a moderate to low increase in accessibility compared to the financial impact on the entity)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Finding 193657 Additional Photo

BFID: 193658

The T-shaped or circular turning space has excessive slopes.

Surface slopes greater than 1:48 (2.08%) are not permitted.
Citation:
2010 ADAS Section 304.2
Floor or ground surfaces of a turning space shall comply with 302. Changes in level are not permitted.

2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193659

The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.

Recommendation:
Provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions and within reach range of the operable part. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding

BFID: 193660

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193662

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 193661

The openings of trash or recycling receptacles and dog waste bag dispensers are considered operable parts and must comply with 309 of the ADAAS. 309 requires that a clear floor space with less than 2% slope be provided at operable parts.
Citation:
2010 ADAS Section 309.2
A clear floor or ground space complying with 305 shall be provided.

Recommendation:
Pour additional concrete in front of the trash can to provide a clear floor space of at least 30" by 48" with a slope of less than 2% in all directions, and to reduce the reach range to the operable part. Additionally, install a small curb to retain loose gravel from spilling into the clear floor space. Alternatively, relocate the operable part to an already level pad of concrete within reach ranges.
Barrier Priority:
Moderate (3): Should be completed as soon as possible, but there may be other items that will provide greater access to persons with disabilities. (Includes findings that have a high financial impact on the entity in relationship to the degree of access provided)
Department:
Parks & Recreation
Image of finding

BFID: 193608

Where there is a triangular junction of three routes, the "points" of that junction are turning spaces that shall not have slopes greater than 1:48 (2.08%). The "sides" of the triangle, connecting the paths that lead away from the junction to each other, are walking surfaces that shall not have running slopes greater than 1:20 (5%).

More than one of these elements have findings associated with them in this case.
Citation:
2010 ADAS Section 304.2 Exception
Slopes not steeper than 1:48 shall be permitted.

2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Replace non-compliant turning spaces so that they have a less than 2% slope in all directions. Replace the connectors between these turning spaces so that they have cross slopes less than 2% and running slopes less than 5%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding

BFID: 193665

The path of travel contains multiple issues and is not accessible.
Citation:
2010 ADAS Section 403.1
Walking surfaces that are a part of an accessible route shall comply with 403.

Recommendation:
Install a dedicated curb cut / vehicle entrance for maintenance vehicles somewhere along Potomac. Reinforce the concrete to protect it from the weight of the vehicles.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding

BFID: 193664

There are multiple issues with this curb ramp including:
Citation:
2010 ADAS Section 406
Curb Ramps

Recommendation:
Remove and replace the curb ramp.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding

BFID: 193663

The accessible route of travel on the walk or sidewalk has cross slopes greater than 2%.

Cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope).
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

Play Areas

BFID: 189684

The city has an obligation to provide access to programs and services. The baseball field is about 30' from the nearest sidewalk.
Citation:
2015 IBC Section 1104.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site.

2010 ADAS Section 206.2.2
At least one accessible route shall connect accessible buildings, accessible facilities, accessible elements, and accessible spaces that are on the same site.

Recommendation:
Evaluate baseball fields across city parks and determine which to make accessible.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189684 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
No accessible route to the baseball field

BFID: 189758

The surface of the play area is sand. There is about 3500 square feet of sand.
Citation:
2010 ADAS Section 302.1
Floor and ground surfaces shall be stable, firm, and slip resistant and shall comply with 302.

Recommendation:
Provided engineered wood fill.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189758 Main Photo
Additional Finding Photos
Sand play area with small poured in place surface

BFID: 189688

The surface of the pedestrian access route is not firm, stable and slip resistant due to the sand spilling out of the play area.
Citation:
2011 PROWAG Section R302.7
The surfaces of pedestrian access routes and elements and spaces required to comply with R302.7 that connect to pedestrian access routes shall be firm, stable, and slip resistant and shall comply with R302.7.

Recommendation:
Replace the sand with engineered wood fiber. In the meantime, keep the sand swept off the sidewalk. Cost estimate included in another finding.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189688 Main Photo
Additional Finding Photos
Sand build-up on the sidewalk
Sand build-up on the sidewalk
Finding 189688 Additional Photo

BFID: 193637

The accessible path of travel has cross slopes greater than 2%.

Surface cross slopes shall not exceed one unit vertical in 48 units horizontal (2-percent slope). When the slope in the direction of travel of any walk exceeds 1 unit vertical in 20 units horizontal (5-percent slope), it must be constructed as a ramp.
Citation:
2010 ADAS Section 403.3
The running slope of walking surfaces shall not be steeper than 1:20. The cross slope of walking surfaces shall not be steeper than 1:48.

Recommendation:
Remove and replace at <2%.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 189689

The surface of the pedestrian access route has openings greater than 1/2 inch.

The entire poured in place are is about 340 square feet.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Remove and replace the poured in place surface.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189689 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Deteriorating poured in place surface
Deteriorating poured in place surface and sidewalk
Play area with sand and deteriorating poured in place surface
Finding 189689 Additional Photo
Finding 189689 Additional Photo
Finding 189689 Additional Photo

BFID: 193639

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace the panel.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding
Image that depicts the citation requirements of the code or standard

BFID: 189690

The walkway contains abrupt vertical edges and/or variations over a 1/2 inch.

1/4 inch is the maximum vertical rise. Changes in level between 1/4 inch and 1/2 inch must be beveled at 1:2 or less.

Changes in level greater than 1/2 inch must be by way of a ramp.
Citation:
2010 ADAS Section 303.3
Changes in level between 1/4 inch (6.4 mm) high minimum and 1/2 inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2.

2010 ADAS Section 303.2
Changes in level of 1/4 inch (6.4 mm) high maximum shall be permitted to be vertical.

Recommendation:
Remove and replace.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189690 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Vertical displacement and deterioration of sidewalk
Vertical displacement and deterioration of sidewalk
Vertical displacement and deterioration of sidewalk
Vertical displacement and deterioration of sidewalk
Finding 189690 Additional Photo
Finding 189690 Additional Photo

BFID: 189704

At two joint lines, there is 3/8" vertical displacement.

The surface of the pedestrian access route has vertical discontinuities greater than 1/2 inch or between 1/4 inch and 1/2 inch that are not beveled.
Citation:
2011 PROWAG Section R302.7.2
Vertical surface discontinuities shall be 13 mm (0.5 in) maximum. Vertical surface discontinuities between 6.4 mm (0.25 in) and 13 mm (0.5 in) shall be beveled with a slope not steeper than 50 percent. The bevel shall be applied across the entire vertical surface discontinuity.Advisory R302.7.2 Vertical Surface Discontinuities. The allowance for vertical surface discontinuities is for occasional expansion joints and objects such as utility covers, vault frames, and gratings that cannot be located in another portion of the sidewalk outside the pedestrian access route. However, objects such as utility covers, vault frames, and gratings should not be located on curb ramp runs, blended transitions, turning spaces, or gutter areas within the pedestrian access route. This may not always be possible in alterations, but should be avoided wherever possible. Vertical surface discontinuities between unit pavers should be minimized.

Recommendation:
Grind to 1/4".
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Finding 189704 Main Photo
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Vertical displacement at the court entrance
Finding 189704 Additional Photo

BFID: 189705

At midcourt, there is a 1" gap. It was previously filled but is deteriorating.

There is a 3" by 2-1/2" by 2" deep hole in the surface. The panel is also fractured.

The fence is pulled 4" away from the posts.

The surface of the pedestrian access route has openings greater than 1/2 inch.
Citation:
2011 PROWAG Section R302.7.3
Horizontal openings in gratings and joints shall not permit passage of a sphere more than 13 mm (0.5 in) in diameter. Elongated openings in gratings shall be placed so that the long dimension is perpendicular to the dominant direction of travel.

Recommendation:
Clean out and refill the gap. Remove and replace the fractured panel. Reattach the fence.
Barrier Priority:
Important (2): Should be completed as soon as possible. (Includes findings that would remove barriers to the greatest number of people to your goods and services)
Department:
Parks & Recreation
Gap in the court surface
Image that depicts the citation requirements of the code or standard
Additional Finding Photos
Deteriorating court surface
Fence around the court is not attached
Fence around the court is not attached

Shared Use Path

BFID: 193656

The cross slope of the pedestrian access route is excessive.

The cross slope of pedestrian access routes shall be 2 percent maximum.
Citation:
2011 PROWAG Section R302.6
Except as provided in R302.6.1 and R302.6.2 (Pedestrian Street Crossings Without Yield or Stop Control and Midblock Pedestrian Street Crossings), the cross slope of pedestrian access routes shall be 2 percent maximum.

Advisory R302.6 Cross Slope. The cross slope requirements in R302.6 apply to sidewalks and other pedestrian circulation paths, pedestrian street crossings and at-grade rail crossings, and pedestrian overpasses and underpasses and similar structures (see R302.2). The cross slope of the pedestrian access route is measured perpendicular to the direction of pedestrian travel. Cross slope requirements are contained in R304.5.3 for curb ramps and blended transitions, and in R407.3 for ramps.

Recommendation:
When next rehabilitating this stretch of concrete, consider providing a distinguishable pedestrian pathway (patterned concrete?) either within or to one side of the clear width of the Shared Use Path. Ensure this pathway is compliant. This might especially be a consideration when trails intersect / travel through neighborhood parks where more / diverse traffic might be encountered.
Barrier Priority:
High (1): Should be completed immediately. (Includes findings that have little or no cost, were in violation of the codes at the time of construction, or pose an imminent safety threat)
Department:
Parks & Recreation
Image of finding