| 25-20 | October 2025 | Rate Case Filing Review– 2026 |
| 25-19 | September 2025 | Business Continuity and Disaster Recovery |
| 25-18 | September 2025 | Ethics Program |
| 25-17 | June 2025 | Electric and Gas Cost Adjustments and Electic and Gas Capacity Charges |
| 25-15 | June 2025 | Southern Delivery System Partner Billing - 2024 |
| 25-13 | June 2025 | Capital Projects Prioritization and Management |
| 25-09 | May 2025 | Board Instruction 2, Financial Conditions and Activities, and Instruction 8, Asset Protection |
| 25-08 | April 2025 | Gas Cost Adjustment |
| 25-07 | March 2025 | Information Technology Inventory Review |
| 25-05 | March 2025 | Board Instruction 4, Risk Management |
| 25-02 | February 2025 | Sustainable Energy Plan Monitoring - 2024 |
| 24-27 | November 2024 | System Improvement Program and Line Extension Service Standards |
| 24-25 | October 2024 | Billing System Controls Audit |
| 24-23 | October 2024 | Enterprise Resource Planning System Implementation |
| 24-22 | October 2024 | Annual Follow-up |
| 24-21 | October 2024 | 2025-2029 Rate Case |
| 24-20 | October 2024 | Electric and Gas Cost Adjustments |
| 24-18 | July 2024 | Underground Damage Prevention Safety Program |
| 24-17 | July 2024 | Southern Delivery System Partner Billing – 2023 |
| 24-14 | June 2024 | Board Instruction I-2, Financial Conditions and Activities, and I-8, Asset Protection |
| 24-12 | May 2024 | Operational Fiber Network Expansion |
| 24-11 | April 2024 | Southwest Power Pool Participation |
| 24-09 | April 2024 | Fleet Maintenance Insourcing |
| 24-08 | March 2024 | Electric and Gas Cost Adjustments, and Electric and Gas Capacity Charges |
| 24-07 | March 2024 | 2023 Enterprise Resource Planning Implementation Review |
| 24-06 | March 2024 | Utilities Board Instruction 4, Risk Management |
| 24-04 | February 2024 | Sustainable Energy Plan Monitoring |
| 24-03 | January 2024 | Invoice Pricing Controls Review |
| 24-01 | January 2024 | Gas Cost Adjustment |
| 23-19 | December 2023 | Annual Follow-Up |
| 23-22 | November 2023 | Information Technology Account Management |
| 23-18 | October 2023 | 2024 Electric and Gas Rate Case |
| 23-17 | August 2023 | Southern Delivery System (SDS) Partner Billing – 2022 |
| 23-16 | August 2023 | Fleet Management and Maintenance Services Procurement |
| 23-15 | July 2023 | Customer Technology Modernization Implementation |
| 23-13 | July 2023 | Gas Cost Adjustment, Electric Capacity Charge, and Gas Capacity Charge |
| 23-12 | May 2023 | Enterprise Balanced Scorecard |
| 23-10 | April 2023 | I-2, Financial Conditions and I-8, Asset Protection |
| 23-08 | March 2023 | Sustainable Energy Plan Monitoring - 2022 |
| 23-06 | March 2023 | Instruction I4 |
| 23-05 | March 2023 | Electric Cost Adjustment and Gas Cost Adjustment |
| 23-03 | Feb 2023 | Resource Management System User Access |
| 23-01 | January 2023 | Enterprise Resource Planning System Implementation |
| 22-24 | November 2022 | Colorado Springs Utilities Electric Cost Adjustment and Gas Cost Adjustment |
| 22-23 | October 2022 | Colorado Springs Utilities 2023 Rate Case |
| 22-22 | October 2022 | 2022 Annual Follow-Up |
| 22-21 | Sept 2022 | Electric Cost Adjustment and Gas Cost Adjustment |
| 22-17 | August 2022 | Colorado Springs Utilities Reliability Program |
| 22-14 | June 2022 | Electric Cost Adjustment and Gas Cost Adjustment |
| 22-12 | May 2022 | 22-12 Board Instructions 2 Financial Conditions and 8 Asset Protection |
| 22-11 | May 2022 | Colorado Springs Utilities Gas Cost Adjustment |
| 22-10 | April 2022 | Sustainable Energy Plan Monitoring |
| 22-09 | April 2022 | Southern Delivery System Partner Billing – 2021 |
| 22-06 | March 2022 | Utilities Board Instruction 4, Risk Management |
| 22-05 | Jan. 2022 | Colorado Spring Utilities Procurement Card Program |
| 22-04 | Jan. 2022 | Utilities Electric Cost Adjustment and Gas Cost Adjustment |
| 22-01 | Jan. 2022 | Review of Colorado Springs Utilities February 2021 Natural Gas Price Event |
| 21-24 | Dec. 2021 | Customer Technology Modernization Program |
| 21-23 | Nov. 2021 | City of Colorado Springs and Colorado Springs Utilities Liability Claims and Workers’ Compensation Reserve Funds Audit |
| 21-22 | Nov. 2021 | Procurement System Implementation |
| 21-21 | Nov. 2021 | Electric Cost Adjustment and Gas Cost Adjustment |
| 21-20 | Nov. 2021 | 2022 Rate Case |
| 21-19 | Sept. 2021 | Annual Follow-up |
| 21-17 | Aug. 2021 | Southern Delivery System Partner Billing |
| 21-16 | Aug. 2021 | Qualifying Stormwater Expenses |
| 21-12 | May 2021 | Utilities Board Instructions I-2 Financial Conditions & I-8 Asset Protection |
| 21-11 | Mar. 2021 | Utilities ECA effective 04-01-21 |
| 21-08 | Mar. 2021 | Monitor Board Instruction 4 Risk Management |
| 21-07 | Mar. 2021 | Utilities GCA effective 03-11-21 |
| 21-04 | Feb. 2021 | Joint Dispatch Agreement Trading and Settlements |
| 21-03 | Feb. 2021 | Billing Internal Controls |
| 21-02 | Jan. 2021 | Utilities ECA and GCA |
| 21-01 | Jan. 2021 | Utilities Gas Process Improvements |
| 20-31 | Nov. 2020 | CSU Mobile Device Administration |
| 20-30 | Nov. 2020 | 2020 Annual Follow-up |
| 20-29 | Nov. 2020 | Utilities ECA and GCA |
| 20-27 | Oct. 2020 | Utilities Billing User Access |
| 20-25 | Oct. 2020 | Utilities 2021 Rate Case |
| 20-24 | Oct. 2020 | CSU 2021 Gas Forecast |
| 20-23 | Sept. 2020 | Utilities Reliability Program |
| 20-21 | June 2020 | Utilities ECA and GCA effective 08-01-20 |
| 20-20 | June 2020 | Advanced Meter Infrastructure Program |
| 20-19 | June 2020 | Personally Identifable Information |
| 20-18 | June 2020 | City & CSU Qualifying Strmwater Expenses 2019 |
| 20-16 | May 2020 | Utilities Fourth Quarter Spend Analysis |
| 20-15 | May 2020 | Southern Delivery System Partner Billing |
| 20-13 | May 2020 | Monitoring Utilities Board Instructions I-2 Financial Conditions & I-8 Asset Protection |
| 20-12 | May 2020 | Utilities GCA |
| 20-08 | May 2020 | Utilities Disbursements |
| 20-10 | March 2020 | Utilities ECA effective 04-01-20 |
| 20-06 | March 2020 | Monitoring Colorado Springs Utilities Board Instruction 4 Risk Management |
| 20-03 | February 2020 | Affordable Housing |
| 20-02 | February 2020 | Utilities ECA and GCA |
| 20-01 | January 2020 | Ethics Policies and Practices |
| 19-23 | December 2019 | Utilities Third Party Vendor Data Risk |
| 19-22 | October 2019 | Utilities ECA & GCA effective 11-01-19 |
| 19-21 | October 2019 | Utilities Phillip H. Tollefson Water Treatment Plant |
| 19-20 | October 2019 | Annual Follow-up |
| 19-18 | October 2019 | Utilities 2020 Rate Case |
| 19-16 | September 2019 | Utilities Water and Wastewater Forecast and Electric Load Study |
| 19-15 | September 2019 | City and CSU Qualifying Stormwater Expenses for 2018 |
| 19-14 | July 2019 | ECA and GCA |
| 19-13 | July 2019 | Network and Network Devices |
| 19-11 | May 2019 | Monitoring Utilities Board Instructions I-2 Financial Condition & I-8 Asset Protection |
| 19-10 | April 2019 | Colorado Springs Utilities Electric Cost Adjustment and Gas Cost Adjustment |
| 19-09 | April 2019 | Colorado Springs Utilities Southern Delivery System Partner Billing |
| 19-08 | April 2019 | Colorado Springs Utilities Westside Avenue Action Plan |
| 19-07 | April 2019 | Colorado Springs Utilities Payroll Audit |
| 19-06 | March 2019 | Annual Report Utilities Board Instruction 4 Risk Management |
| 19-02 | February 2019 | Colorado Springs Utilities Investments |
| 19-01 | January 2019 | Electric Cost Adjustment and Gas Cost Adjustment |
| 18-34 | December 2018 | Southern Delivery System Partners |
| 18-31 | Nov. 2018 | CSU Disaster Recovery and Business Continuity Final |
| 18-30 | Nov. 2018 | Fleet Mgmt & Maint Serv Procurement Final |
| 18-28 | Nov. 2018 | CSU Monitoring Rev Bill Sys Modifications for City Res Stormwater |
| 18-27 | Nov. 2018 | City & CSU Qualifying Stormwater Expenses 2017 Final |
| 18-26 | Oct. 2018 | Electric Cost Adjustment and Gas Cost Adjustment |
| 18-25 | Oct. 2018 | 2018 Annual Follow-up |
| 18-24 | Oct. 2018 | 2019 Rate Case Final |
| 18-23 | Oct. 2018 | Water & Wastewater Forecast Final |
| 18-22 | Oct. 2018 | 2C Impacts on Subsurface Infrastructure |
| 18-21 | July 2018 | Colorado Springs Utilities Electric Cost Adjustment, Gas Cost Adjustment, and Gas Capacity Charge |
| 18-17 | May 2018 | IT Capacity Planning |
| 18-14 | April | Electric & Gas Cost Adjustment |
| 18-11 | April | Procurement Audit |
| 18-10 | April | ECA and GCA Account Verification Review |
| 18-9 | April | Annual External Report on Executive Limitations (4) Asset Protection and (7) Financial Conditions and Activities |
| 18-8 | March | Drake 5 Shutdown |
| 18-7 | March | Real Estate Record Retention |
| 18-6 | March | Annual External Report on Executive Limitation 11 Enterprise Risk Management |
| 18-5 | March | Banning Lewis Ranch Annexation |
| 18-3 | January | GCA report |
| 18-2 | January | Residential Water Bills Review |
| 17-33 | December 2017 | Nixon Emission Controls |
| 17-32 | December 2017 | Streets Maintenance Operations and Coordination |
| 17-31 | December 2017 | Fleet Savings Verification |
| 17-30 | November 2017 | Colorado Springs Utilities Southern Delivery System Monitoring |
| 17-29 | November 2017 | Colorado Springs Utilities Cybersecurity Audit |
| 17-28 | November 2017 | Colorado Springs Utilities Purchasing Card Audit |
| 17-27 | November 2017 | Colorado Springs Utilities 2018 Rate Case Audit |
| 17-26 | October 2017 | Colorado Springs Utilities Electric and Gas Cost Adjustments |
| 17-25 | October 2017 | Colorado Springs Utilities Verification of Qualifying Stormwater Expenses |
| 17-21 | July 2017 | Colorado Springs Utilities Water Forecast |
| 17-20 | July 2017 | Information Technology Change Management Audit |
| 17-19 | July 2017 | Allowance for Funds During Construction |
| 17-18 | July 2017 | Electric Cost Adjustment |
| 17-17 | June 2017 | Colorado Springs Utilities Financial Forecast Model |
| 17-16 | May 2017 | Energy Trading and Risk Management Application |
| 17-15 | April 2017 | Electric Cost Adjustment |
| 17-14 | April 2017 | Liability Claims and Workers' Compensation Reserve Funds |
| 17-13 | April 2017 | Pole Attachments |
| 17-12 | April 2017 | Capital Improvement Projects |
| 17-11 | April 2017 | Annual External Report on Executive Limitations (4) Asset Protection and (7) Financial Conditions and Activities |
| 17-08 | March 2017 | Annual External Report on Executive Limitation 11 - Enterprise Risk Management |
| 17-07 | February 2017 | Electric Cost Adjustment |
| 17-03 | January 2017 | Electric & Gas Cost Adjustment |
| 17-02 | January 2017 | Nixon Emission Controls Audit |
| 16-25 | October 2016 | Electric & Gas Cost Adjustment |
| 16-24 | October 2016 | SCADA Change Management |
| 16-22 | October 2016 | Payroll and Labor |
| 16-21 | October 2016 | 2017 Rate Case Audit |
| 16-20 | September 2016 | 2016 Annual Audit Follow-Up |
| 16-17 | July 2016 | Electric and Gas Cost Adjustment |
| 16-15 | July 2016 | Cell Phone and Other Wireless Devices |
| 16-14 | July 2016 | Cash Disbursements |
| 16-12 | June 2016 | Customer Care and Billing General Controls |
| 16-11 | June 2016 | ETL 2016 Rate Filing |
| 16-10 | May 2016 | Street Maintenance and Operations Coordination |
| 16-07 | April 2016 | Annual External Report on Executive Limitations (4) Asset Protection and (7) Financial Conditions and Activities |
| 16-04 | March 2016 | Annual External Report on Executive Limitation 11 - Enterprise Risk Management |
| 16-03 | February 2016 | 2015 Southern Delivery System Monitoring Report |
| 16-02 | January 2016 | Electric and Gas Cost Adjustment |
| 16-01 | January 2016 | State Grants Management |
| 15-39 | December 2015 | Drake Scrubber Audit |
| 15-38 | December 2015 | Smart Grid Implementation |
| 15-36 | December 2015 | Debt Management |
| 15-35 | December 2015 | Accrued Revenue |
| 15-34 | December 2015 | Electric and Gas Cost Adjustments |
| 15-30 | November 2015 | Utilization of Outside Legal Counsel |
| 15-29 | November 2015 | 2016 Rate Case Audit |
| 15-28 | October 2015 | Annual Audit Recommendations Follow Up |
| 15-27 | October 2015 | Multiyear Water Rate Follow Up |
| 15-25 | October 2015 | Metering Audit |
| 15-24 | August 2015 | Comparison of Projected to Actual Revenue |
| 15-23 | August 2015 | 2015 Fleet Audit |
| 15-22 | July 2015 | Geographic Information System (GIS) |
| 15-18 | May 2015 | Purchasing System Review |
| 15-16 | May 2015 | Capital Projects Audit |
| 15-15 | May 2015 | Financial and Human Resource Software Audit |
| 15-11 | Apr-2015 | Annual External Report on Executive Limitations (4) Asset Protection and (7) Financial Conditions and Activities |
| 15-10 | Mar-15 | Electric Cost Adjustment |
| 15-09 | Mar-15 | Nixon SO2 Scrubber Procurement |
| 15-06 | Mar-15 | Annual External Report on Executive Limitation 11 - Enterprise Risk Management |
| 15-05 | Feb-15 | Interest Rate Hedging Program |
| 15-03 | Feb-15 | Southern Delivery System Monitoring Report |
| 15-02 | Jan-15 | Gas Cost Adjustment |
| 15-01 | Jan-15 | Wind Power Tariff |
| 14-33 | Dec-14 | Cash Receipts Audit |
| 14-31 | Nov-14 | SharePoint Audit |
| 14-30 | Nov-14 | Electric Cost of Service Study |
| 14-29 | Nov-14 | Drake Scrubber Audit |
| 14-28 | Nov-14 | Annual Follow-up Audit |
| 14-25 | Oct-14 | Gas Cost Adjustment |
| 14-24 | Sep-14 | Nixon SO2 Scrubber Procurement |
| 14-22 | Sep-14 | Electric Cost Adjustment |
| 14-20 | Aug-14 | Compensation Study Changes |
| 14-18 | Jul-14 | Allocation and Load Study |
| 14-17 | Jul-14 | Electric Cost Adjustment |
| 14-14 | Jun-14 | Unemployment Compliance Audit |
| 14-12 | May-14 | Electric Cost Adjustment |
| 14-11 | May-14 | Purchasing Card Audit |
| 14-10 | May-14 | Annual External Report on Executive Limitation EL-4 Asset Protection and EL-7 Financial Conditions and Activities |
| 14-09 | Apr-14 | Drake Scrubber Audit |
| 14-08 | Mar-14 | Water Shortage Tariff Report |
| 14-05 | Mar-14 | Annual External Report on Executive Limitation 11 - Enterprise Risk Management |
| 14-04 | Feb-14 | Claims Reserve and Workers' Compensation Funds Audit |
| 14-03 | Feb-14 | 2013 Southern Delivery System Monitoring Report |
| 14-02 | Jan-14 | Gas and Electric Cost Adjustment |
| 14-01 | Jan-14 | Credit and Collection Audit |
| 13-25 | Dec-13 | Maximo Application Audit |
| 13-24 | Dec-13 | 2013 Annual Follow-up Report |
| 13-23 | Dec-13 | E-Commerce Review |
| 13-22 | Nov-13 | Gas Cost Adjustment |
| 13-21 | Nov-13 | 2014 Electric and Gas Rate Review |
| 13-20 | Oct-13 | Community Solar Garden RFP Compliance Audit |
| 13-17 | Oct-13 | Utilities Rate Competitiveness Audit |
| 13-14 | Sep-13 | Utilities Billing Audit |
| 13-13 | Aug-13 | Proposed Solar Garden Expansion Tariff Report |
| 13-12 | Aug-13 | Natural Gas Hedging Program Audit Report |
| 13-11 | Jun-13 | 2012 Southern Delivery System Monitoring Report |
| 13-09 | Apr-13 | Annual External Report on EL-11 |
| 13-08 | Apr-13 | Proposed Solar Garden Expansion Tariff |
| 13-07 | Apr-13 | Annual Report on EL-4 and EL-7 |
| 13-06 | Apr-13 | Utilities Payroll Audit |
| 13-04 | Mar-13 | Drought Response Tariff Report |
| 13-03 | Feb-13 | Utilities Coal Purchase Review |
| 13-02 | Feb-13 | Community Solar Garden Audit |
| 13-01 | Feb-13 | Utilities Debt Management Audit |
| 12-24 | Dec-12 | Data Center Audit Report |
| 12-23 | Nov-12 | Electric and Gas Cost Adjustments |
| 12-21 | Nov-12 | 2013 Electric and Gas Rate Case Filing |
| 12-19 | Oct-12 | Annual Follow-up Executive Summary |
| 12-17 | Sep-12 | Claims Reserve and Workers' Compensation Fund |
| 12-14 | Aug-12 | 2011 SDS Monitoring Report |
| 12-13 | Jun-12 | Multi-Year Water Rate Case Report |
| 12-12 | May-12 | Electric and Gas Cost Adjustments |
| 12-11 | May-12 | Gas Transportation (G4T) Tariff Charges |
| 12-09 | May-12 | Procurement Audit Report |
| 12-07 | May-12 | Disbursements Audit Report |
| 12-06 | May-12 | EL 4 and EL 7 Report |
| 12-02 | Mar-12 | EL-11 Report |
| 12-01 | Feb-12 | Gas Cost Adjustment Review |
| 11-26 | Dec-11 | Annual Follow-Up Audit Report |
| 11-24 | Dec-11 | CSU P-Card Audit Report |
| 11-23 | Dec-11 | CSU Rate Case Review |
| 11-22 | Nov-11 | SDS Project Monitoring Report |
| 11-18 | Sep-11 | Review of Community Solar Garden Pilot Bill Credit Tariff |
| 11-16 | Sep-11 | Electric Cost Adjustment Review |
| 11-15 | Aug-11 | Executive Limitation 11 |
| 11-12 | May-11 | Electric Cost Adjustment |
| 11-09 | Apr-11 | Annual External Report on Executive Limitation (EL) 4 and 7—Asset Protection and Financial Conditions and Activities |
| 11-07 | Mar-11 | Chief Executive Officer Performance |
| 11-06 | Mar-11 | Electric Cost Adjustment, Gas Cost Adjustment and Capacity Charge Adjustment Review |
| 11-03 | Feb-11 | Executive Limitation 11 |
| 10-23 | 12/01/10 | Cash Receipts Audit |
| 10-22 | 11/18/10 | 2011 Rate Case Review |
| 10-20 | 11/18/10 | Annual Follow Up Report |
| 10-19 | 10/13/10 | Streetlight Fee Calculation |
| 10-18 | 10/06/10 | Gas Cost Adjustment |
| 10-16 | 08/05/10 | Executive Limitation 11 |
| 10-12 | 05/21/10 | Gas Cost Adjustment |
| 10-10 | 04/15/10 | Multi-Year Rate Case |
| 10-09 | 04/28/10 | Claims Reserve & Workers' Compensation Funds |
| 10-08 | 04/15/10 | Chief Executive Officer Performance |
| 10-07 | 04/15/10 | Executive Limitations 4 & 7 |
| 10-05 | 03/26/10 | 2009 Annual Follow Up Report |
| 10-03 | 03/17/10 | Gas Cost Adjustment |
| 10-02 | 02/08/10 | Executive Limitation 11 |